设为首页 | 收藏本站
网站首页 | 公司简介 | 客户验厂咨询 | 体系认证咨询 | 成功案例 | 新闻快讯 | 申请审核 | 人才招聘 | 联系我们 | ewq
  • 深圳海明达
  • 深圳海明达
您现在的位置:首页 > 客户验厂咨询 > Target 验厂咨询
海明达验厂中心专业为您提供:深圳BSCI认证咨询|广州WRAP认证咨询|中山SA8000认证咨询|汕头人权验厂咨询|ICTI认证咨询|BSCI验厂咨询|TESCO乐购验厂咨询|Target塔吉特验厂咨询|深圳WAL-MART沃尔玛验厂咨询|东莞Disney迪士尼验厂咨询|客户验厂清单-等各类验厂认证咨询!:李先生,电话:18002546991
客户验厂
联系我们

深圳总部:
联系人:李先生(项目经理)
Mobile:18002546991
T E L   :0755-22306760
Q Q  :1165841073
Email:
szhaimingda@163.com

客户验厂咨询 > Target 验厂咨询
Target验厂-生产能力与质量管理体系审核清单
TARGET CORPORATION PRODUCTION SERVICES
 
 
 
 
FACTORY PROFILE AND EVALUATION
 
HARDLINES
 
 
 
 

 

VENDOR: Prejecting 2500 Ltd
 
EVALUATOR:      
REP:  Helen Au Yeung
 
DATE: (mm/dd/yy) 22 Feb, 2006
TITLE: Director
 

 

 
Note: Items with “PT” should be done as part of plant tour.
 
 
PLANT INFORMATION
 

 

1.NAME: Taizhou Rival Arts Co., Ltd
 
CONTRACTOR:
2.ADDRESS: North Town Section West Industrial,
 
IF YES, LIST THE NAME OF CONTRACTORS:
Development Zone, Huangyan, Taizhou, Zhejiang
 
     
     
 
     
3.TELEPHONE NUMBER: 86-0576-4056288
 
     
     
 
     
4.FAX NUMBER: 86-0576-4067222
 
     
5.CONTACT PERSON: Pan Xiaohong
 
 
     
 
 
6.E-MAIL ADDRESS: tzrfgy@163.com
 
 
     
 
SCORE:        

 

 
 
 
 
Area I - BUSINESS PRACTICES AND ADMINISTRATION:
(* A negative answer will equal an automatic failure)
 
 

 

7.
DOES THE PLANT CONFIRM IT COMPLIES WITH:
 
a.
LOCAL\NATIONAL ENVIRONMENTAL LAWS *
 
b.
LOCAL\NATIONAL OCCUPATIONAL SAFETY LAWS *
 

 

 

 

8.
DOES THE PLANT HAVE :
 
a.
CLEAR AISLES?   *     PT
 
b.
ARE THERE CLEAR EMERGENCY EXITS ON EACH FLOOR?   *   PT
 
c.
ARE THEY UNLOCKED?   *
 
d.
ARE THEY ACCESSIBLE?   *
 
e.
FIRE FIGHTING EQUIPMENT IN PROXIMITY OF WORK AREA?   *   PT
 
f.
FIRST AID EQUIPMENT ON PROXIMITY OF WORK AREA?    * PT
 
g.
TRAINED MEDICAL PERSONNEL?      PT
 

 

 

 

9.
IS RESIDENTIAL HOUSING PROVIDED?      PT
 
a.
DOES IT COMPLY WITH PT 8?   *
 

 

 

 

10.
WHAT IS THE MINIMUM WORKING AGE? 18      YEARS
 
 
DOES IT COMPLY WITH LOCAL, NATIONAL MINIMUM AGE LAWS? (TC REQUIRES A MINIMUM OF 14
 
 
OR OLDER)   *
 
 
 
 
11.
WHAT IS THE MINIMUM WAGE (US$)?
 
 
SKILLED LABOR:HR\WK\MO    610RMB
 
 
UNSKILLED LABOR:HR\WK\MO     610RMB
 
 
DOES IT COMPLY WITH LOCAL AND\OR NATIONAL MINIMUM WAGE LAWS?   *
 
 
 
 
12.
WHAT ARE THE NORMAL WORKING HOURS?
 
 
PER DAY:           PER WEEK:      
 
 
 
 
13.
WHAT IS THE EMPLOYEE HEADCOUNT?
 
 
TOTAL PLANT: QTY:      
 
 
TOTAL QA: QTY:      
 
 
 
 
14.
DO YOU MANUFACTURE IN CA OR NY?
 
a.
DO YOU HAVE A BUSINESS LICENSE?   *
 
 
IF YES, PLEASE ATTACH A COPY.
 
 
 
 
15.
STAFFING RATIO:
 
a.
TOTAL PRODUCTION WORKERS           RATIO      
 
b.
INDUSTRIAL ENGINEERS           RATIO      
 
c.
MECHANICS           RATIO      
 
d.
IN-LINE QA AUDITORS           RATIO      
 
e.
PRODUCTION SUPERVISORS           RATIO      
 
f.
INDIRECT AND OTHER SUPPORT           RATIO      
 
g.
PRODUCTION SQUARE FOOTAGE            RATIO      
 
 
 
 
16.
IS THE BUILDING STEEL OR MASONRY?
 

 

 
 
 
 
Area II – MANUFACTURING
Total Points: 30
 
 
 
 
A. FACILITIES
 
 

 

17.
ARE AVAILABLE MACHINES\EQUIPMENT\FIXTURES SUITABLE TO PRODUCE CLIENT'S
 
 
 
PRODUCT?     PT
2 pts.
 
 
 
 
 
18.
ARE MACHINES\EQUIPMENT PERIODICALLY MAINTAINED, CALIBRATED, AND CHECKED?
2 pts.
 
 
 
 
 
19.
DOES THE FACTORY POSSESS A STRONG MAINTENANCE TEAM?
2 pts.
 
 
 
 
 
 
 
 
 
20.
IS THE TOTAL PRODUCTION MACHINERY OPERATED UNDER A MAINTENANCE SCHEDULE?
2 pts.
 
 
 
 
 
 
 
 
 
21.
ARE INJECTION, ROTOCAST MOLDS, SPRAYING MASKS STORED TO AVOID RUST OR BEING
 
 
 
WORN OUT?      PT
2 pts.
 
 
 
 
 
22.
LIST MAJOR MACHINERY\UTILITIES IN FACTORY ON A SEPARATE PAGE (INCLUDE NUMBER
 
 
 
OF UNITS AND AGE)
 
 
 
 
 
 
 
 
 
 
 
SUB-TOTAL:
     
/ 10

 

 
 
 
B. COMMUNICATION & DOCUMENTATION CONTROL :
 
 

 

23.
DO FACTORY’S MANAGEMENT AND KEY STAFF UNDERSTAND ENGLISH SUFFICIENTLY TO
 
 
 
ENSURE COMMUNICATION ?
2 pts.
 
 
 
 
 
24.
IS THERE AN ADEQUATE AND FORMAL SYSTEM FOR RECEIVING PURCHASE ORDERS?
1 pt.
 
 
 
 
 
25.
IS THERE AN ADEQUATE AND FORMAL SYSTEM FOR RECEIVING AND APPLYING
 
 
 
DRAWINGS, PROCEDURES, DESIGN CHANGE, ETC., CORRECTLY?
1 pt.
 
 
 
 
 
26.
ARE DRAWINGS, RECORDS, AND SPECIFICATIONS EASILY AVAILABLE THAT REFLECT A
 
 
 
HISTORY OF CHANGES?
1 pt.
 
 
 
 
 
27.
IN THE CASE OF AUTHORIZED SUBCONTRACTING, DOES FACTORY PROVIDE ADEQUATE
 
 
 
SUPERVISION AND SPECIFICATIONS TO ENSURE THE COMPLIANCE TO THE
 
 
 
REQUIREMENTS OF CLIENT’S STANDARDS?
2 pts.
 
 
 
 
 
28.
DOES FACTORY HAVE CLEAR INSTRUCTIONS TO ITS DEPARTMENTS TO DELEGATE
 
 
 
AUTHORITY TO STOP PRODUCTION IF THE PRODUCTS DO NOT MEET REQUIREMENTS OF
2 pts.
 
 
CLIENT’S STANDARDS?
 
 
 
 
 
 
29.
DOES FACTORY WORK CLOSELY AND EFFICIENTLY WITH CLIENT ON THE ASSIGNED
 
 
 
PROJECT TO ADVISE AND DISCUSS ANY FAILURE ON PROCESSING PROBLEMS?
1 pt.
 
 
 
 
 
 
 
 
 
 
SUB-TOTAL:
     
/10

 

 
 
C. PACKING:
 
 

 

30.
IS THE PACKING AREA TIDY AND FREE OF CONTAMINATION?      PT
1 pt.
 
 
 
 
 
31.
IS THERE ADEQUATE SAFEGUARD TO PREVENT ANOTHER COMPANY'S PRODUCTS FROM
 
 
 
BEING PACKED INTO MASTER CARTON?
1 pt.
 
 
 
 
 
32.
IS THERE ADEQUATE CONTROL TO PREVENT ANY DEFECTIVE OR REJECTED PRODUCTS
 
 
 
FROM BEING PACKED INTO MASTER CARTON?
1 pt.
 
 
 
 
 
 
 
 
 
 
 
 
 
33.
ARE FINAL FINISHED PRODUCTS WELL SEGREGATED FROM SEMI-FINISHED PRODUCTS IN
 
 
 
THE PACKING AREA?      PT
1 pt.
 
 
 
 
 
34.
ARE FINISHED PRODUCTS PACKED OR PROPERLY STORED IMMEDIATELY TO AVOID DUST
 
 
 
AND DIRT?      PT
1 pt.
 
 
 
 
 
35.
ARE PRODUCTS PASSED THROUGH METAL DETECTORS BEFORE PACKING?
1 pt.
 
 
(ONLY APPLICABLE TO PRODUCTS WITHOUT METAL COMPONENTS OR CHILDREN
 
 
 
PRODUCTS)
 
 
 
 
 
 
36.
ARE PACKED MASTER CARTONS STORED IN A COVERED AREA OR A GOOD SHELTER TO
 
 
 
KEEP FROM SUNSHINE AND TO AVOID BEING FLOODED OR RAINED UPON?
1 pt.
 
 
 
 
 
 
 
 
 
 
SUB-TOTAL :
     
/ 7

 

 
 
 
D. NON-CONFORMING MATERIALS:
 
 

 

37.
IS NON-CONFORMING MATERIAL PROPERLY SEGREGATED AND IDENTIFIED AT ALL
 
 
 
STAGES?      PT
1 pt.
 
 
 
 
 
38.
ARE ADEQUATE RECORDS MAINTAINED TO SHOW THE STATUS OF SUCH NON-
 
 
 
CONFORMING MATERIALS?
1 pt.
 
 
 
 
 
39.
DO RECORDS SHOW THAT REWORKED PARTS\ MATERIALS HAVE BEEN REINSPECTED TO
 
 
 
COMPLY WITH STANDARDS?
1 pt.
 
 
 
 
 
 
 
 
 
 
SUB-TOTAL:
     
/ 3

 

 
 
 
Area III – QUALITY
Total Points: 70
 
 
 
A. SYSTEMS
 
 

 

40.
IS THERE A FORMAL QA PROGRAM?
10 pts.
 
 
(WRITTEN PROCEDURES BEING USED, RECORDS OF DEFECT LEVELS,DCL'S)
 
 
 
 
 
 
41.
IS THERE IN-PROCESS QUALITY CONTROL?
1 pt.
 
 
 
 
 
42.
ARE DEFECT RECORDS KEPT?
4 pts.
 
 
MACHINE:             
 
 
 
OPERATOR:          
 
 
 
FINAL:                    
 
 
 
 
 
 
43.
IS THERE QC SUPERVISOR\MANAGER ON ALL SHIFTS?
5 pts.
 
 
 
 
 
44.
IS QA INDEPENDENT OF PRODUCTION?
5 pts.
 
 
 
 
 
 
 
 
 
45.
ARE THERE FORMAL TRAINING PROGRAMS?
3 pts.
 
 
OPERATOR:           
 
 
 
INSPECTION:         
 
 
 
MECHANIC      :      
 
 
 
 
 
 
46.
DO YOU INSPECT TO A STANDARD AQL?
4 pts.
 
 
WHAT IS YOUR AQL?    0,2.5,4.0
 
 
 
 
 
 
47.
WHAT IS THE PERCENT OF SECONDS?          
 
 
 
 
 
 
48.
ARE PRODUCT SPECIFICATIONS BEING USED?
1 pt.
 
 
BY WHOM?         
 
 
 
 
 
 
49.
ARE PACKAGING SPECIFICATIONS BEING USED?
1 pt.
 
 
BY WHOM?         
 
 
 
 
 
 
50.
SHADE CONTROLS?
1 pt.
 
 
 
 
 
51.
ARE THE FACTORY'S QC PERSONNEL CERTIFIED BEFORE THEY PERFORM THEIR JOB AS
 
 
 
OUTLINED IN THE QC PROCEDURE?
1 pt.
 
 
 
 
 
52.
DOES THE FACTORY USE INTERNATIONAL, NATIONAL, CLIENT'S, OR ITS OWN APPROVED
 
 
 
STANDARDS TO PERFORM IN-HOUSE QUALITY CONTROL?
1 pt.
 
 
 
 
 
53.
DOES FACTORY HAVE A DETAILED WRITTEN PLAN DEMONSTRATING HOW SAFETY
 
 
 
REQUIREMENTS ON PRODUCTS ARE CHECKED IN HOUSE?
1 pt.
 
 
 
 
 
54.
DOES QC FULLY UNDERSTAND FACTORY'S QUALITY POLICY AND THE IMPORTANCE OF
 
 
 
THE QUALITY ASSURANCE CONCEPT?
1 pt.
 
 
 
 
 
55.
DOES QC HAVE ADEQUATE BASIC KNOWLEDGE AND EXPERTISE ON PRODUCTS TO BE
 
 
 
MADE AND GENERAL MANUFACTURING TECHNOLOGY?
1 pt.
 
 
 
 
 
 
 
 
 
 
SUB-TOTAL:
     
/ 40

 

 
 
 
B. PRODUCT PERFORMANCE TESTING:
 
 

 

56.
DO YOU HAVE ON-SITE TESTING?      PT
5 pts.
 
 
 
 
 
57.
ARE RECORDS KEPT?
5 pts.
 
 
BY WHOM?         
 
 
 
 
 
 
 
 
 
 
 
SUB-TOTAL:
     
/ 10

 

 
 
 
C. INCOMING INSPECTIONS:
 
 

 

58.
HAS THE FACTORY TAKEN ADEQUATE MEASURES TO ASSURE RAW MATERIALS
 
 
 
CONFORM TO REQUIRED SPECIFICATIONS BEFORE USE?
1 pt.
 
59.
ARE INCOMING AND OUTGOING RAW MATERIALS MONITORED AND DOCUMENTED?
1 pt.
 
 
 
 
 
60.
ARE RAW MATERIALS KEPT IN CONTROLLED STOREROOMS TO AVOID THEFT, LOSS, AND
 
 
 
DETERIORATION?
1 pt.
 
 
 
 
 
61.
ARE RAW MATERIALS, IF NECESSARY, INSPECTED BEFORE PRODUCTION? ARE
 
 
 
RECORDS TRACEABLE? IS THE INSPECTION SAMPLING SCHEDULE ADEQUATE?      PT
1 pt.
 
 
 
 
 
62.
ARE THERE WRITTEN RAW MATERIAL INSPECTION INSTRUCTIONS AVAILABLE AS
 
 
 
GUIDELINES TO INSPECTORS?
1 pt.
 
 
 
 
 
 
 
 
 
 
SUB-TOTAL:
     
/ 5

 

 
 
D. FINAL INSPECTIONS:
 
 

 

63.
DOES FACTORY'S QC PERFORM INTERNAL FINAL RANDOM INSPECTION (FRI)?
5 pts.
 
 
 
 
 
64.
ARE INTERNATIONAL, CLIENT'S, OR OTHER APPROVED STANDARDS USED?
1 pt.
 
 
 
 
 
65.
ARE THERE WRITTEN FORMAL INSPECTION REPORTS AND FILED FOR REVIEW?
1 pt.
 
 
 
 
 
66.
ARE CUSTOMER DRAWINGS\SPECIFICATIONS READILY AVAILABLE FOR QUALITY
 
 
 
CONTROL OR ENGINEERING DEPARTMENT ON REQUEST?
1 pt.
 
 
 
 
 
67.
IS THE SAMPLING SIZE OF PRODUCTS FOR FINAL INSPECTION SUFFICIENT FOR A
 
 
 
STATISTICAL ANALYSIS OF THE QUALITY OF MERCHANDISE?
1 pt.
 
 
 
 
 
68.
ARE THERE PROCEDURES TO REQUIRE ACCEPTABLE INSPECTION REPORTS TO
 
 
 
AUTHORIZE THE SHIPMENT OF THE PRODUCTS?
1 pt.
 
 
 
 
 
69.
DOES FACTORY PERFORM 100% OR STATISTICAL CHECK ON FUNCTIONALITY?
5 pts.
 
 
 
 
 
 
 
 
 
 
SUB-TOTAL:
     
/ 15
 
友情链接
网站首页 | 公司简介 | 客户验厂咨询 | 体系认证咨询 | 成功案例 | 新闻快讯 | 申请审核 | 人才招聘 | 联系我们 | ewq

联系人:李先生   手机:18002546991   电话:0755-22306760   邮箱:szhaimingda@163.com

深圳海明达管理咨询有限公司 版权所有